Tourism Visas Spain

Show MTS stations. MKZD: ring city train and transfer to Nati. Tickets with travel limit

Reconstruction of the Moscow Central Circle (MCC)- a unique project not only for Moscow, but also for Russia as a whole. The MCC has become a full-fledged light metro, integrated into the metro system.

The MCC map is included in the capital's metro map. It shows the approximate time of ground transfers from the MCC.

In addition, the diagram indicates possible transfers from the MCC to ground urban transport, traffic intervals, etc.

Traffic around the ring was launched on September 10, 2016. This gave a new impetus to the development of abandoned industrial areas of the capital, and also made it possible to cut the Gordian knot of transport problems hanging over the capital.

The Moscow Central Circle is the road to the future. Thanks to the ring, trips around the capital take an average of 20 minutes. Another unique feature of the MCC was that it connected the capital’s garden and park ensembles: the Mikhalkovo estate, the Botanical Garden, the territories of VDNKh and the Elk Island National Park, the Vorobyovy Gory nature reserve and others.

MCC is a new life for industrial zones of Moscow

Since 1908, the Moscow Central Circle served industrial zones and mainly performed the function of transporting goods. However, over time, many industrial areas around this ring fell into disrepair, and some industries closed. A number of industrial zones were, at best, used for warehouses. Now these territories are being actively reorganized, housing with social facilities, sports complexes, etc. are being built here. And developing territories require convenient transport connections.

The launch of passenger traffic along the MCC resolves the issue of transport support for industrial zones. In addition, the ring connected suburban trains and electric trains that go to the city center with MCC stations. Passengers can, before reaching the city center, transfer to MCC trains and move further throughout almost the entire territory of Moscow.

All MCC stations were built as transport hubs (TPU). They will include offices, shopping malls, shops and cafes. This concept meets both the interests of investors, for whom it is important to recoup investments in construction, and the needs of citizens.

We built it for you
Extra time

The Moscow Central Circle is part of the transport system of the future capital.
It gives the city an alternative to choosing new routes, reduces the load on the metro and train stations in the city center and makes a trip around Moscow an average 20 minutes Briefly speaking.

About the MCC project

The city train is a new type of public transport that appeared in the capital on September 10, 2016 with the opening of the Moscow Central Circle (MCC).

New generation Lastochka trains run along the railway ring during metro operation. You won’t have to wait more than 6 minutes for an electric train during rush hours, and you can change to the metro for free - the MCC has the same pass as the metro.

Marat Khusnullin, Deputy Mayor of Moscow for Urban Development Policy and Construction:

The launch of traffic on the Moscow Central Circle is a breakthrough project for the capital. The MCC will build a new transport logistics system in the city. There will be a redistribution of transit flows from the center to the middle part of the city, adjacent territories will become more accessible, passenger traffic in the metro will decrease and roads will be partially cleared.
The load on the main metro lines, primarily the Circle Line and central interchange stations, will be reduced by more than 15%.

Interactive map

We have developed especially for you
interactive map

Select a station
and find out more details

3 2 1 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5

District

Location

The intersection of Station Street and Lokomotivny Proezd

Passenger traffic during peak hours

2017 - 4600 people

2025 - 11,600 people

Transfer

  • Art. District Lyublinsko-Dmitrovskaya line (2017)

  • 154, 238, 24, 24k, 282, 692, 82, 85, 114, 149, 170, 179, 191, 206, 215, 215k, 63, 656

  • 36, 47, 56, 78

  • pl. Okruzhnaya (Savelovskoe direction of the Moscow Railway)

By the time traffic on the MCC was launched in September 2016, the Okruzhnaya transport hub had only a transfer to the Savyolovskaya Railway. A metro transfer will appear in 2017, when construction of the Okruzhnaya station on the Lyublinsko-Dmitrovskaya line is completed.

Likhobory

Location

The intersection of Cherepanov passage and the Oktyabrskaya railway

Passenger traffic during peak hours

2017 - 5900 people

2025 - 8900 people

Transfer

  • 114, 123, 179, 204, 87

  • Pl. NATI (Leningrad direction of Railways)

Car parking

From the Likhobory station there is a transfer to the NATI platform of the Leningrad direction of the Oktyabrskaya railway, as well as to ground urban passenger transport from new stopping points along Cherepanov Passage.

Koptevo

(opened October 2016)

Location

In the area of ​​Cherepanov passage 24

Passenger traffic during peak hours

2017 - 7600 people

2025 - 9200 people

Transfer

  • 123, 621, 90, 22, 72, 801, 87

  • 23, 30

From the Koptevo station, via an overpass you can go to the tram ring of routes running from the Voykovskaya and Timiryazevskaya metro stations, as well as to bus stops on Mikhalkovskaya Street.

Baltic

Location

In the area of ​​Leningradskoe highway, no. 16A. 7

Passenger traffic during peak hours

2017 - 3100 people

2025 - 7600 people

Transfer

  • Art. "Voikovskaya" Zamoskvoretskaya line (pedestrian gallery through the Metropolis shopping center)

  • 780, 905, N1, 114, 179, 204, 621, 90

  • 57, 43, 43k, 6

Car parking
1000 parking spaces 2025

From the Baltiyskaya MCC station you can transfer to city passenger transport (bus, trolleybuses and minibuses). For this purpose, new stops have been installed along Admiral Makarov Street and Novopetrovsky Proezd. A pedestrian crossing from the street was also built over the railway tracks. Admiral Makarov to Novopetrovsky Proezd, it is connected to the Metropolis shopping center, from where you can go to the Voikovskaya metro station.

Adjacent to the northwestern part of the station is the Pokrovskoye-Streshnevo natural and historical park, created on the basis of the park of the former Pokrovskoye-Streshnevo estate.

Streshnevo

Location

In the area of ​​Svetly proezd no. 4

Passenger traffic during peak hours

2017 - 4700 people

2025 - 5700 people

Transfer

  • 12, 70, 82

  • Pl. Streshnevo (Riga direction of the Moscow Railway, promising, 2017)

Car parking
43 parking spaces 2017

In 2017, a transfer will be organized from the Streshnevo MCC station to the new Streshnevo platform of the Riga direction of the railway. Now from here you can transfer to ground urban passenger transport. New stops have been installed along 1st Krasnogorsky Proezd and Volokolamsk Highway.

On the northern side, the Pokrovskoye-Streshnevo natural and historical park adjoins the Streshnevo station.

Panfilovskaya

(opened October 2016)

Location

The intersection of Panfilov and Alabyan streets

Passenger traffic during peak hours

2017 - 4100 people

2025 - 5300 people

Transfer

  • 100, 105, 26, 691, 88, 800

  • 19, 59, 61

For a convenient transfer from the Panfilovskaya station to ground public transport, new stops with drive-in pockets have been installed on Panfilov Street. Three overpasses were also built.

Within walking distance from Panfilovskaya there is the Oktyabrskoye Pole station on the Tagansko-Krasnopresnenskaya metro line.

To the northeast of the station there is a cultural heritage monument “Architectural and planning complex of the village of Sokol”. Nearby is the Fraternal Cemetery for soldiers who died in the war of 1914 and the sisters of mercy of Moscow communities, as well as the Birch Grove park.

Sorge

(opened October 2016)

Location

In the area of ​​st. Sorge d.21

Passenger traffic during peak hours

2017 - 1900 people

2025 - 3500 people

Transfer

  • 48, 64, 39, 39k

  • 43, 86, 65

Car parking

Not far from the planned territory is the Oktyabrskoye Pole station of the Moscow Metro.

From the Sorge MCC station you can transfer to ground urban passenger transport. For this purpose, new stops with drive-in pockets are planned to be built on Sorge and Marshal Biryuzov streets.

Khoroshevo

Location

In the area of ​​Khoroshevskoe highway no. 43

Passenger traffic during peak hours

2017 - 3000 people

2025 - 3400 people

Transfer

  • Art. "Polezhaevskaya" Tagansko-Krasnopresneskaya line (pedestrian connection)

    Art. "Khoroshevskaya" of the Third Interchange Circuit (prospective, pedestrian connection)

  • 39, 39k, 155, 155k, 271, 294, 48, 800

  • 20, 20k, 21, 35, 35k, 43, 85, 86

To transfer from the Khoroshevo MCC station to ground urban passenger transport, new stops with drive-in pockets have been installed on 3rd Khoroshevskaya Street and Marshal Zhukov Avenue. Within walking distance from Khoroshevo there is the Polezhaevskaya metro station on the Tagansko-Krasnopresnenskaya line.

Partially, the platforms of the Khoroshevo station are located on the overpass above the Khoroshevskoe highway and form a single whole with it.

Shelepikha

Location

The intersection of Shmitovsky Proezd and 3rd Magistralnaya Street

Passenger traffic during peak hours

2025 - 31,200 people

Transfer

  • Art. “Shelepikha” Third transfer circuit (warm circuit)

Car parking
(by 2025)
Multi-level parking 680 parking spaces
Multi-level parking 800 parking spaces
Multi-level parking 500 parking spaces

From the Shelepikha station you can transfer to the Testovskaya platform of the Smolensk direction of the railway, and at the end of 2016 to the new Shelepikha metro station of the Third Interchange Circuit.

Business center

Location

Near the Mezhdunarodnaya metro station on the Filevskaya line

Passenger traffic during peak hours

2017 - 10,400 people

2025 - 13900 people

Transfer

  • Art. "International" Filevskaya line

  • Pl. Testovskaya (Smolensk direction of the Moscow Railway)

Car parking

A terminal with ticket offices and turnstiles of the Delovoy Tsentr MCC station was built under the overpass of the Third Transport Ring, which is connected to the northern pavilion of the Mezhdunarodnaya metro station. Thus, from the Delovoy Tsentr MCC station you can immediately go down to the metro lobby, as well as exit onto Testovskaya Street to the stops of ground public transport or through an underground pedestrian crossing to Moscow City. There will also be an exit to the opposite side to the Botanical Garden.

The Delovoi Tsentr transport hub will be one of the largest on the MCC. Walking communication is provided to the Testovskaya platform in the Smolensk direction. It is also planned to build a parking lot, an underground passage from the Business Center transport hub to Moscow City, and an above-ground pedestrian gallery from the Business Center transport hub directly to the Moscow City building (above Testovskaya Street). The elevated pedestrian crossing will be built in the second stage.

The transport hub includes the construction of an office center and parking areas (second stage). The total building area is 151 thousand square meters. m.

Kutuzovskaya

Location

Near the Kutuzovskaya metro station on the Filevskaya line

Passenger traffic during peak hours

2017 - 5800 people

2025 - 10,000 people

Transfer

  • Art. "Kutuzovskaya" Filevskaya line (pedestrian connection)

  • 116, 157, 205, 477, 840, 91, N2

  • 2, 39, 44, 7

From the Kutuzovskaya MCC station you can transfer to the Kutuzovskaya station of the Filevskaya metro line, as well as to ground urban passenger transport.

Luzhniki

Location

In the area of ​​st. Khamovnichesky Val, 37

Passenger traffic during peak hours

2017 - 6500 people

2025 - 9800 people

Transfer

  • "Sportivnaya" Sokolnicheskaya line
    (pedestrian connection)

  • 15, 5, 132, 64

Luzhniki station consists of two shore-type landing platforms and a ground-based vestibule with access to the street. Khamovnichesky Val.

You can transfer to the Sportivnaya station on the Sokolnicheskaya metro line, as well as to ground city passenger transport.

Luzhniki station will become the main transport hub for the main arena of the 2018 FIFA World Cup.

Gagarin Square

Location

Near the Leninsky Prospekt metro station on the Kaluzhsko-Rizhskaya line

Passenger traffic during peak hours

2017 - 9200 people

2025 - 14,500 people

Transfer

  • Art. "Leninsky Prospekt" Kaluzhsko-Rizhskaya line

  • 111, 144, N1, 196

  • 14, 39

  • 33, 33k, 4, 62, 7, 84

From the Gagarin Square MCC station, you can use an underground pedestrian crossing to transfer to the Leninsky Prospekt station of the Kaluzhsko-Rizhskaya line of the Moscow Metro, as well as to ground urban passenger transport. "Gagarin Square" is the only MCC station located underground.

Crimean

Location

In the area of ​​Sevastopolsky Prospekt 12

Passenger traffic during peak hours

2017 - 5700 people

2025 - 7000 people

Transfer

  • 121, 41, 826

  • 26, 38

An overground pedestrian crossing with exits to the Krymskaya station was built between 4th Zagorodny Proezd and Sevastopolsky Prospekt. Ground urban transport stops along 4th Zagorodny Proezd have been reconstructed with the installation of drive-in pockets.

Adjacent to the station’s borders from the north-west is the security zone of the cultural heritage site “Kanatchikova Dacha” (Psychiatric Clinical Hospital No. 1 named after N.A. Alekseev).

Verkhniye Kotly

Location

At the intersection of Warsaw Highway and Nagorny Proezd

Passenger traffic during peak hours

2017 - 3000 people

2025 - 5400 people

Transfer

  • 25, 44, 142, 147, 275, 700

  • 16, 3, 35, 47

  • 1, 1k, 40, 71, 8

  • Paveletsky direction of the Moscow Railway (promising, 2017)

Car parking

The Verkhnie Kotly MCC station will provide a transfer to ground urban passenger transport. In 2017, a transfer to the Paveletskaya direction of the Moscow Railway will be organized from here, for which a new platform will be built.

ZIL

Location

In the area of ​​2nd Kozhukhovsky proezd, no. 23

Passenger traffic during peak hours

2017 - 7200 people

2025 - 11,800 people

Transfer

As part of the ZIL MCC station, two terminals with ticket offices and turnstiles were built - southern and northern, on the outer and inner sides of the railway tracks. In the future, an administrative and business building with retail facilities will be erected here, a parking lot, and above-ground and underground parking will be equipped. For public transport, a turning area will be organized on the western side of the MCC and a road network will be developed.

From the ZIL station you can go towards the Ice Palace “Park of Legends” and to the stops of ground public transport (on the outside of the MCC).

Avtozavodskaya

Location

In the area of ​​2nd Kozhukhovsky proezd, no. 15

Passenger traffic during peak hours

2017 - 6100 people

2025 - 7600 people

Transfer

  • Art. "Avtozavodskaya" Zamoskvoretskaya line (pedestrian connection)

  • 186, 216, 263, 8, 142, 193, 291, 44, 142, 193, 291, 44

From the Avtozavodskaya MCC station you can transfer to the Avtozavodskaya station of the Zamoskvoretskaya metro line, as well as to ground urban passenger transport.

Dubrovka

Location

In the area of ​​2nd Mashinostroeniya Street, 40

Passenger traffic during peak hours

2017 - 9200 people

2025 - 15,100 people

Transfer

  • Art. "Dubrovka" (pedestrian connection)

  • 161, 193, 9, 670, 186, 633

  • 20, 40, 43, 12

Near the Dubrovka MCC station there is the Dubrovka metro station of the Lyublinsko-Dmitrovskaya line. You can also transfer to ground urban passenger transport.

Ugreshskaya

Location

In the area of ​​2nd Ugreshsky passage

Passenger traffic during peak hours

2017 - 3700 people

2025 - 7300 people

Transfer

  • 20,40,43

At the Ugreshskaya station, two passenger terminals and an elevated pedestrian crossing were built. In the future, it is planned to build a technological link from the northern passenger terminal of the Ugreshskaya transport hub to Volgogradsky Prospekt.

Novokhokhlovskaya

Location

In the area of ​​Novokhokhlovskaya street vl. 89

Passenger traffic during peak hours

2017 - 6800 people

2025 - 18,300 people

Transfer

  • 106, new routes

  • Pl. Novokhokhlovskaya (Kursk direction of the Moscow Railway, promising, 2017)

Now from the Novokhokhlovskaya station you can only transfer to ground urban passenger transport. And in 2017, a transfer to the Kursk direction of the railway will be organized here, for which a new platform will be built.

Nizhny Novgorod

Location

In the area of ​​Nizhegorodskaya street no. 105

Passenger traffic during peak hours

2017 - 15,500 people

2025 - 22200 people

Transfer

  • Art. “Nizhegorodskaya street” (Kozhukhovskaya line, promising, 2018)

  • 143, 143k, 279, 29k, 51, 805, 59, 759, 859

  • Pl. Karacharovo (Gorky direction of the Moscow Railway)

From the Nizhegorodskaya MCC station you can transfer to the Karacharovo platform of the Gorky direction of the railway, as well as to ground urban passenger transport. In 2018, this transport hub will include the Nizhegorodskaya Street station of the Kozhukhovskaya metro line.

Andronovka

Location

In the area of ​​the Freser platform of the Kazan direction of the railway

Passenger traffic during peak hours

2017 - 4800 people

2025 - 9100 people

Transfer

  • Pl. Frezer (Kazan direction of Moscow Railways)

Car parking
60 parking spaces 2016

From the Andronovka MCC station you can transfer to the Freser railway platform and ground urban passenger transport, which goes to the Aviamotornaya station of the Kalininskaya metro line.

Near the Andronovka station there is the historical territory “Behind the Kamer-Kollezhsky Val” (a cultural heritage site - a residential building), as well as a complex of buildings and structures of the Moscow Circular Railway (1903-1908, architect A.N. Pomerantsev, engineer A.D. Proskuryakov).

Highway Enthusiasts

Location

Intersection of the North-East Expressway and Entuziastov Highway

Passenger traffic during peak hours

2017 - 9300 people

2025 - 12800 people

Transfer

  • Art. "Highway Enthusiasts" Kalininskaya line (pedestrian connection)

  • 141, 36, 83, 125, 141, 254, 702, 214, 46, 659

  • 24, 34, 36, 37, 8

  • 30, 53, 68

Passengers exit from the MCC platform into an underground pedestrian crossing that connects the street. Utkina and Entuziastov highway.

Falcon Hill

Location

Crossing 8th St. Sokolinaya Gora with Okruzhny Proezd

Passenger traffic during peak hours

2017 - 5000 people

2025 - 5600 people

Transfer

Car parking

The nearest metro stations are Partizanskaya and Shosse Entuziastov. On the eastern side of the transport hub there is a specially protected area of ​​the Izmailovo natural and historical park.

Izmailovo

Location

In the area of ​​Okruzhny proezd no. 16

Passenger traffic during peak hours

2017 - 5500 people

2025 - 7000 people

Transfer

  • Art. "Partizanskaya" Arbatsko-Pokrovskaya line (pedestrian connection)

  • 20, 211

  • 11, 34 , 32

  • 22, 87

The Izmailovo station on the MCC and the Partizanskaya metro station will be connected by an elevated pedestrian crossing that will stretch from Okruzhny Passage over the roadway of the North-Eastern Expressway. The two passage lobbies contain ticket offices, sanitary rooms and elevators.

Locomotive

Location

In the area of ​​the southern lobby of the Cherkizovskaya metro station on the Sokolnicheskaya line

Passenger traffic during peak hours

2017 - 5800 people

2025 - 10,100 people

Transfer

  • Art. "Cherkizovskaya" (warm circuit)

  • 171, 230, 34, 34k, 52, 716, 716s

  • 32, 41, 83

Transfer to the Cherkizovskaya metro station on the Sokolnicheskaya line is carried out via the pedestrian gallery. To transfer to city passenger transport, new stops were built along Okruzhny Proezd near the pavilions of the Cherkizovskaya metro station.

Rokossovsky Boulevard

Location

Near the metro station "Rokossovsky Boulevard" of the Sokolnicheskaya line

Passenger traffic during peak hours

2017 - 3500 people

2025 - 7400 people

Transfer

  • Art. "Rokossovsky Boulevard" Sokolnicheskaya Line (pedestrian connection)

  • 265, 80, 86, 86k, 3, 75, 775, 822

  • 213, 36, 2, 29, 33, 46, 4l, 7

The metro station of the same name and the MCC "Rokossovsky Boulevard" are located within walking distance of each other. You can also transfer to ground urban passenger transport. For this purpose, new stops have been built along Otkrytoye Highway, 6th Podbelsky Passage and Ivanteevskaya Street.

White stone

Location

Eastern administrative district of Moscow within the boundaries of the Losiny Ostrov National Park

Passenger traffic during peak hours

2017 - 2500 people

2025 - 3500 people

Transfer

  • by ground transport to the station. "Rokossovsky Boulevard" Sokolnicheskaya Line

  • 75,822

The nearest metro station is the Rokossovsky Boulevard station on the Sokolnicheskaya metro line, which is located at the intersection of Ivanteevskaya Street and Otkrytoye Shosse.

From the Belokamennaya MCC station you can transfer to city buses. For public transport there is a turning area on Yauzskaya Alley street.

Rostokino

Location

Projected passage No. 1214

Passenger traffic during peak hours

2017 - 15,100 people

2025 - 18,500 people

Transfer

  • 136, 172, 244, 316, 317, 388, 392, 425, 451, 499, 551, 576, 789, 834, 93

  • 14, 76

  • Pl. Severyanin (Yaroslavl direction of the Moscow Railway)

Car parking

From the Rostokino MCC station you can transfer to the Severyanin platform of the Yaroslavl Railway, as well as to ground urban passenger transport: new stops, a parking lot and a turning area for buses have been built here.

From the east, the Losiny Ostrov State National Park adjoins the Rostokino station.

Botanical Garden

Location

Serebryakova passage, vl. 2

Passenger traffic during peak hours

2017 - 7400 people

2025 - 9800 people

Transfer

  • Art. "Botanical Garden" of the Kaluzhsko-Rizhskaya Line

  • 154, 33, 603, 71, 195, 134, 185, 61, 628, 789

The MCC "Botanical Garden" station is located near the "Botanical Garden" metro station on the Kaluzhsko-Rizhskaya line. The transfer is carried out via an underground pedestrian crossing under the railway, which connects Serebryakova passage and 1st street. Leonova.

Vladykino

Location

Near the Vladykino metro station on the Serpukhovsko-Timiryazevskaya line

Passenger traffic during peak hours

2017 - 7700 people

2025 - 11,800 people

Transfer

  • Art. "Vladykino" Serpukhovsko-Timiryazevskaya line

  • 259, 33, 53, 637, 154, 238, 33, 637, 24, 24k, 76, 85

An elevated pedestrian crossing leads from the MCC platform to the Vladykino metro station, which will connect the southern and northern metro lobbies. A parking lot and a turning area for ground urban passenger transport have also been built here.

54 km

Total ring length

31 stations

Moscow Central Circle (MCC)

Advantages of the MCC

Urban areas
got closer

Downtown
became freer

Transport network created
with many transfers

More than 350 possible options for routes around the city

The railway ring passes through 26 districts of Moscow, where about 2 million people live

IN FIVE AREAS OF MCC WILL BE THE FIRST TYPE OF OFF-STREET TRANSPORT THAT IS NOT DEPENDENT ON THE WEATHER AND TRAFFIC TRAFFIC

Metrotown

Beskudnikovsky

Khoroshevo-Mnevniki

Nizhny Novgorod

(430 thousand people)

Total area of ​​the zone of influence of the ring
estimated at 10.8 thousand hectares
or about 12% of the territory of Moscow inside the Moscow Ring Road.

Passenger traffic growth
up to 300 million people per year
from 2025 - 2030

Metro lines will become freer

34.5 million people per year will transfer from the metro to the MCC

Moscow stations will be short of passengers

With the opening of passenger traffic on the MCC, congestion will be significantly relieved
several metro lines, as well as capital train stations. Residents of the Moscow region, entering the capital on commuter trains, will more often get off the train before reaching the final station, that is, the train station.

It will be freer during peak hours

12.7 million passengers will transfer to the MCC from buses
7.5 million passengers will be residents of nearby houses

Rates

You can pay for travel with tickets “United”, “90 minutes”, “Troika” card

32 RUR

20 trips - 747 c 40 trips - 1494 c 60 trips - 1765 c

60 c

FREE transfer from MCC to metro
and back - within 90 minutes For a FREE transplant you need save your ticket and again attach
him on the turnstile. Without paying for travel again, you can also make a triple transplant:
metro - MCC - metro

By creating a unique transport system, Moscow integrated the MCC into the existing transport network of the city and, most importantly, into the Moscow Metro system. The MCC became the ground ring line of the capital's subway.
You can pay for your ticket at the ticket office at any MCC station with a bank card.
In the future, it is planned to introduce modern fare payment technologies: NFC (payment for travel using a mobile phone), Pay Pass / Pay Wave (contactless payment by bank card).

"Without the sound of wheels"

Fast “Swallows” reach speeds of up to 160 km/h, but at the same time do not cause “noisy inconvenience” to citizens.

All electrified rolling stock is noticeably quieter than diesel locomotives and meets modern environmental requirements.

Protective screens will protect citizens from unnecessary noise
and the creation of the so-called “velvet road” - without the sound of wheels.

This technology involves laying railway tracks using special technology in separate 800-meter sections.

Why will the city train become a popular mode of transport among Muscovites?

A trip along the MCC will be many times more comfortable than in the metro. 110 “swallows” ply along the railway ring, each designed for 1,200 people.

New generation city electric trains are equipped with

Security on the MCC

Rail transport traditionally remains one of the most dangerous in the world. However, emergency situations do not occur with trains, but with inattentive passengers who step onto the rails in prohibited places.
A fence has been installed along the entire perimeter of the MCC, which will prevent unauthorized access to the railway tracks.

The total length of the fence was 108 km

Part of the fence (16 km) are noise barriers that were installed within the boundaries of residential buildings.

Free pass
– does NOT mean uncontrolled

On the Moscow Central Circle, all transport security measures applied in the metro and railway are implemented. For example, profiling will also be carried out here.

Profiling

This method evaluates and predicts human behavior based on the analysis of characteristics of appearance, non-verbal and verbal behavior.
There will also be a traditional search like in the subway. Increased protection for passengers will be provided through a modern turnstile system, detector frames and CCTV, as well as the creation of a separate police unit.

Transport hubs

It will be possible to change from one type of transport to another in a matter of minutes using transport interchange hubs (TPU). They consist of terminals with ticket offices and turnstiles, as well as a system of covered pedestrian galleries - overhead and underground passages that protect passengers from bad weather.

  • 31

    MCC station

  • 17

    transfers to 11 metro lines

  • 10

    transfers to 9 radial railway directions

All stations provide a transfer to city public transport

buses, trams, trolleybuses and autolines

Passengers don’t even have to go outside, which is why this type of transfer is called the “principle” dry feet».

Now ground urban transport brings citizens directly to the ring stations

In the future, transport hubs will become multifunctional: they will include offices, shopping malls, shops and cafes. Investors will invest money in the construction of the commercial part; the city, using funds from the Moscow budget, is building only the technological part of the hub, which performs a transport function. This concept meets the interests of investors, for whom it is important to recoup their investments in construction, and the needs of citizens who will be able to find work or receive necessary services close to home.

In the future, some long-distance trains will be able to disembark passengers before reaching the station. By using the MCC, people will be able to save their time, and train stations in the center of Moscow will become freer.

Parking and rides

There will also be an increase in passengers on the MCC due to some motorists who will choose “traffic-free” movement around the city on rail transport. This will relieve some of the load from overcrowded city highways.

You will be able to park your car in the parking lots at 17 stations Moscow Central Circle. They are ready to accept 2 thousand cars.

These parking lots will operate in the same mode as intercept parking lots at metro stations, of which there are 31 (capacity - 6.6 thousand cars). The largest of them, for 1.48 thousand cars, is located at the Annino metro station.

The Moscow Central Circle will breathe life into abandoned areas around

For 90 years, the district railway was used for the delivery of goods.

During the USSR, the necessary load was provided to it by municipal and industrial enterprises located around. But gradually production fell into decline, and these days these sites are, at best, used for warehouses, and more often they are simply idle.

The MCC is a unique project not only from the point of view of developing transport infrastructure, but also from the point of view of creating new jobs.

After the introduction of new real estate in the area of ​​the MCC stations, about 40 thousand jobs will be created.

Investors have already expressed their readiness to invest in the development of areas around 11 MCC stations. Among them:

"Botanical Garden"

"Vladykino"

"Yaroslavskaya"

"Open Highway"

"Novokhokhlovskaya"

"ZIL"

"Warsaw highway"

"Business center"

"Shelepikha"

"Novopeschanaya"

"Nikolaevskaya"

Attracting private investment will allow Moscow to save budget money and direct it to the development of social and transport infrastructure in other areas of the city.

Former industrial zones will turn into new urban areas

Around the ring, according to calculations by the General Plan Institute, the following can be built:

750 thousand sq. m of commercial real estate.
Of them 300 thousand “squares”- hotels,
250 thousand - trading platforms,
200 thousand - new offices and technology parks.

Moscow has the right to expect that developers will be interested in investing in real estate construction, because after the launch of the MCC, the cost of land around it will increase significantly. The former industrial zones around the MCC fell into disrepair: these territories required an integrated approach. And putting the lands around the railway ring in order became the largest urban improvement project in 2016. Every day, 25.9 thousand people were involved in the improvement of the MCC in the summer of 2016. At the same time, the work was not aimed only at improving the appearance of the stations; the task was also to create convenient pedestrian connections between the MCC and ground urban transport stops.

  • 2,800 trees were planted on the MCC.
  • Renovated facades 111 56 historical buildings. Near 11 stations view zones are created.

    The historical Kanatchikovo station on the MCC will not open to passengers, but will become an interesting excursion site.

    Two residential buildings, a gatehouse, a centralization booth and a warehouse have also been preserved. The Kanatchikovo station has adorned the Moscow Central Circle, being of value to anyone interested in the history of Moscow railways and urban architecture.

    This decision is due to the low passenger traffic in this area. "Kanatchikovo" is located between the stops "Krymskaya" and "Ploshchad Gagarina" parallel to Kanatchikovsky Proezd. The two-story station building from the early 20th century is a cultural heritage site.

    1903 1908 50 versts

    Moscow Central Circle in its entirety
    integrated into the Moscow metro system.

  • Sergei Witte

    History of the creation of the MCC

    In 2018, the Moscow Central Circle will celebrate a unique anniversary: ​​Emperor Nicholas II made the decision to build the “Ring Railway” in Moscow in the fall of 1897.

    The initiator of the project was a great enthusiast of railway transport, Minister of Finance of the Russian Empire Sergei Witte. The circular railway was of great national importance, so the best Russian engineers and architects were involved in the project.

    For 110 years, the MCC’s mission has not changed: saving passengers’ time.

On 50 versts (54 km) was built
14 stations

2
stopping points

30
overpasses

72 bridges
(of which 4 are through
Moscow River)

35 pairs of trains ran along the district per day. Passenger transportation on the MCC did not last long; they were stopped due to unprofitability. For more than a century, the railway ring was used only for the transport of goods and served the industrial zones around it.

The idea of ​​restoring passenger traffic never left Moscow city planners, but work began only in 2012.
It was necessary to completely update the infrastructure: electrify the road, relay the rails and, most importantly, reconstruct eight overpasses at the intersection with highways in order to raise them to a height that would allow new trains to pass through.

The first passengers traveled along the district on September 10, 2016. On the eve of this event, the road was given a new name - the Moscow Central Circle (MCC).

I want to know more
about construction in Moscow

Turn your phone

On September 10, 2016, the Moscow Central Circle will open for passengers in the capital. True, construction work on the new highway will continue after this date: according to the head of the transport department, Maxim Liksutov, some MCC stations will be completed after the start of work. Nevertheless, officials are seriously counting on the highway and hope that over the next two years it will become popular among citizens. In anticipation of the opening of the Central Circle, The Village answers the most popular questions about the new type of urban transport.

What is MCC?

The Moscow Central Ring (formerly known as the Moscow Ring Railway) is a new interchange circuit that should combine the metro and radial directions of suburban railways and greatly decongest the center of Moscow by removing transit passengers from it.

According to its designers, the launch of the route will relieve congestion in the metro by 15%, and the average travel time will decrease by 20 minutes (for example, travel time from the Leninsky Prospekt station to the Mezhdunarodnaya station will be reduced from half an hour to ten minutes). In other words, thanks to the MCC it will be possible to transfer from one metro or train line to another, bypassing the center. In addition, the MCC should partly solve the so-called “Vykhino” problem - a situation in which trains going to the center fill up immediately at the end metro stations. Electric train passengers coming from the Moscow region will be able to transfer to the new ring, and from there to metro lines and other suburban routes.

MCC project estimate

rubles

Planned passenger flow

person per year

Road length

kilometers

Number of stops

station

Transfers on the metro line

stations

Transfers to trains

stations

A full circle ride

minutes

Train intervals

minutes

Train speed

Train capacity

Human

How did the idea for the project come about?

The creation of the MCC is actually not a revolutionary idea. In most Western megacities, the metro and train are not separated and are the same transport: this practice allows passengers to move around the city much faster and easier. The designers of the ring themselves cite the example of Berlin, where the S-Bahn city train and the U-Bahn metro coexist within the same system.

The central ring was created on the basis of the Moscow Circular Railway, the decision to build which was made at the end of the 19th century on the initiative of the Minister of Finance of the Russian Empire, Sergei Witte. They built a ring around Moscow according to the design of engineer P. I. Rashevsky from 1903 to 1908. According to the original design, the route was supposed to have four tracks, which would be divided between goods and passenger traffic, but due to lack of funds, only two tracks were built. In 1930, passenger traffic was closed due to the development of buses and trams, and only freight trains began to operate around the ring.

The return of passenger traffic to the ring is not a new idea: they wanted to launch it back in the 60s, but this was prevented by the complexity of electrifying the ring. Yuri Luzhkov returned to this project again in the late 2000s, but reconstruction of the MCC began under Sobyanin in 2012. The ring was finally electrified, and a third track for freight traffic was also built. The total investments in the project, which was jointly carried out by Russian Railways and the Moscow government, exceeded 200 billion rubles, and 86 billion of them were provided by the federal budget.

Are the MCC and the Third Interchange Circuit the same thing?

No. The MCC is often called the third interchange circuit and the second ring of the Moscow Metro, but this is not so. The second ring metro line, 58 kilometers long, will appear in the capital by 2020, and this year its first section will open - from the Delovoy Tsentr station to Petrovsky Park. The new ring will also include the Kakhovskaya line, built in the late 1960s. If the MCC route, due to historical reasons, is shifted to the north, then the metro ring, on the contrary, will be shifted to the south. Thus, both lines will form a huge figure eight.

How will the MCC connect with other modes of transport?

In total, the MCC will have 31 stations (24 of them will be ready by September 10, the rest will be commissioned before 2018), each of which is planned to be connected to ground transport stops. In the first few months after the official launch of the ring, it will be possible to transfer to the metro at 14 stations, but then they promise to add this option at three more stops. Also, six MCC stations (later their number will increase to ten) will have transitions to commuter train stations.

The transfer time to the MCC will vary depending on the sections: the longest transition will be from the Voikovskaya metro station to the Streshnevo and Baltiyskaya stations - you will have to walk for 12 minutes, while the shortest one will take no more than three minutes. At 11 stations, builders promise to implement the “dry feet” principle: the crossings will be completely closed, which will allow people not to go outside. They promise to build a ground connection between the Volgogradsky Prospekt metro station and the Ugreshskaya platform.

How much will the trip cost?

Fares for travel on the central ring will be the same as in the metro. It will also be possible to use “United”, “Troika” and “90 minutes” tickets. All benefits that apply to metro travel will apply when using the MCC: special conditions for travel along the ring will be provided to people with disabilities, schoolchildren and students.

The number of transfers from the metro to the MCC and vice versa in one trip is not limited. The only condition is that you must make all transfers within 90 minutes. In the first month after the launch of the ring, passengers will have to reprogram the “United” ticket in order to make free trips and transfers to the MCC if it was purchased before September 1, 2016. This can be done at the ticket office of the subway or monorail. For those who use the Troika card, starting from September 1, it will be enough to put more than one ruble on the card.

In addition, passengers will be able to buy tickets at ring stations using both cash and cards. They also plan to introduce a contactless fare payment system, allowing payment using a mobile phone, and PayPass/PayWave, thanks to which money will be debited automatically if you tap a bank card on the validator.

What will the stations look like?

By the opening of the MCC, stations will be equipped with navigation panels in Russian and English. For visually impaired passengers, they promise to install tactile plates on lifts, stepless escalators and Braille. Also, at each station there will be information and boards showing the time of train arrival, and at five stations there will be “Live Communication” counters. In addition, about 70 mirrors, 470 trash cans, gadget charging points, umbrella packers and free toilets will be installed. Trees will be placed in tubs for decoration. Unlike the metro, the MCC will have turnstiles not only at the entrance, but also at the exit, and the platforms will be treated with anti-icing coating.

What trains will be on the MCC?

33 Lastochka trains (five cars each), which are produced at the Ural Locomotives plant in the city of Verkhnyaya Pyshma, Sverdlovsk Region, will run along the ring. The Lastochka prototype is a German electric train from Siemens AG, which served guests and participants of the Sochi Olympics. This summer there was a scandal: during a test drive, an electric train of the ED-4M series was too wide for the platform, but the Lastochka must fit into the dimensions of the track.

The maximum capacity of the Lastochka is 1,200 people, and the maximum speed is 120 kilometers per hour, but along the MCC trains will travel no faster than 40–50 kilometers per hour. The operating hours of the MCC are the same as those of the metro, but the interval of trains on the ring will be longer and will range from five minutes during rush hour to 15 minutes at other times. Now the Yandex.Maps service is preparing to update the metro application in order to inform passengers about the train schedule not only of the metro, but also of the Moscow Central Circle.

All Lastochkas have soft seats and climate control systems. Passengers will be able to use Wi-Fi and devices for charging gadgets. Each train will have toilets at the beginning and end of the train. Unlike ordinary electric trains, Lastochka cars do not have vestibules, but the double doors are wide enough for passengers with limited mobility to pass through.

Will it be possible to travel with strollers and bicycles?

Two of the five train cars (second and fourth) are equipped with bicycle racks. Each carriage can accommodate no more than six bicycles. The trains will also have space for strollers and other large carry-on luggage. Near each transport hub of the MCC they are planning to build bicycle parking and bike sharing stations. Rentals are now available near the Delovoy Tsentr, Ploshchad Gagarina, Luzhniki, Botanical Garden and Vladykino stations.

How to navigate the roundabout?

On September 1, the Moscow government provided several detailed maps of the MCC, which indicate transfers from the Central Circle to ground and suburban transport, as well as on the metro line. The ring itself will be indicated as the 14th metro line.

The names of MCC stations either repeat the usual names of nearby metro stations (“Dubrovka”, “Vladykino”), or indicate the area in which they are located (“Gagarin Square”, “Luzhniki”). In the summer, on the website of the “Active Citizen” project, a vote was held to rename the MCC stations “Voikovskaya” and “Cherkizovskaya”; as a result, they received new names “Baltiyskaya” and “Lokomotiv”.

How will the MCC affect the city outskirts?

The central ring runs mainly through industrial areas. According to the authorities, the emergence of new transport will contribute to the development of these territories, for example ZIL. The mayor's office plans to improve the lands adjacent to the MCC stations: create parking spaces for cars and bicycles, bicycle rentals, landscaping, and also build about 750 thousand square meters of commercial real estate - hotels, retail sites, offices and technology parks.

At the same time, the preserved historical buildings of the Moscow Railway stations, which were designed by architects Alexander Pomerantsev, Nikolai Markovnikov and Ivan Rybin, are now being studied to determine the security zone for each of them. And in the fall, a museum of the history of the MCC will open at the Presnya station, where documents, photographs and films telling about the history of the highway will be presented.

Photos: cover, 1–4, 7 –

The history of the Small Ring of the Moscow Railway is more than a hundred years old. Back in 1908, the circular route was opened for cargo transportation in 9 directions of the Moscow and 1 direction of the Oktyabrskaya railways. In 2012, the ring had 12 operating stations.

Now the Moscow Ring Railway is a “light metro” under construction, a new ground mode of transport, integrated into the overall metropolitan system and allowing passengers to make convenient transfers to buses and trams, metro and electric trains.

The opening of the reconstructed tracks is just around the corner, so it’s time to tell Muscovites and guests of our city in more detail about their advantages.

Latest news about the Moscow Ring Railway

  • At a meeting in mid-April 2016, Vladimir Putin was informed that the first Moscow Ring Railway trains would be launched in September 2016. Further work on the construction of the small ring will be concentrated at the transfer points.
  • In the twentieth of December, updated metro maps appeared in the capital's subway, which included the Small Ring of the Moscow Railway. This was done specifically so that passengers could get acquainted with pleasant prospects in advance and plan future routes.
  • The Moscow Ring Railway will have a modern system for informing passengers via smartphones - for example, a user, being in a specific point in the capital, will be able to receive a message about which station is nearby and how long the train will arrive at it.
  • According to the General Director of the Moscow Ring Railway, Alexei Zotov, train intervals on the Small Ring can be reduced to 2-3 minutes if necessary. In general, trains will run according to the subway schedule - with 6-minute intervals during peak hours and 12-minute intervals at other times.
  • CCTV cameras will be installed at all stops and transport hubs on the Moscow Circle, which will help maintain the proper level of security.
  • Everyone knows that the capital’s metro is an architectural monument that amazes with its grandeur even people who are used to riding it every day. But the “light metro” will also be an interesting piece of architecture, albeit a modern one. Thus, it became known that its stations will be illuminated in different colors in the evening, which will probably look very interesting under the transparent roof.
  • The Moscow Ring Road will be fully adapted for use by people with disabilities. In the ticket office areas of each station there is a special ticket office for wheelchair users, the window height of which is less than a meter.
The section is constantly updated with up-to-date information.

Moscow Ring Railway in numbers

The small ring is:

  • 54 km railway tracks, and taking into account the entrances and adjacent branches - 145 km;
  • 32 stopping points for future passenger transportation and 12 existing freight stations before the start of global reconstruction;
  • 212 billion rubles., invested in repair work;
  • 20 minutes time saved when traveling around the center of the capital;
  • 300 million passengers who will use the “light metro” by 2025;
  • before 100 pairs compositions per day.

Moscow Ring Railway station diagram on the map

The stations of the Small Ring Railway will be full-fledged transport hubs (TPU). This means that they will house offices, cafes, shops, and shopping malls. At each station there is a transfer to ground public transport.

The Moscow Ring Railway will include 32 stations. Let's divide them into categories.

Stations from which you can only transfer to ground transport

Koptevo, Presnya, Belokamennaya, Sokolinaya Gora, ZIL, Sevastopolskaya, Novopeschanaya, Khodynka, Volgogradskaya, Park of Legends

Stations from which a transfer to the metro is implied

Vladykino, Botanical Garden, Open Highway, Cherkizovo, Izmailovsky Park, Enthusiasts Highway, Ryazanskaya, Dubrovka, Avtozavodskaya, Gagarin Square, Luzhniki, Kutuzovo, Shelepikha, Khoroshevo, Voykovskaya, Okruzhnaya

Stations from which you can transfer to the Russian Railways radial line

Streshnevo, Nikolaevskaya, Yaroslavskaya, Andronovka, Novokhokhlovskaya, Warsaw

Stations that allow transfers to both the metro and the Russian Railways radial line

District, Ryazan, City

Construction plan and when will it open?

The reconstruction of the Small Ring, which will result in high-speed passenger traffic, began in 2011. Previously, it was planned to launch the light metro in four stages. Traffic on the section of the first stage Presnya - Kanatchikovo was going to be launched at the end of 2014, and on the section of the second, third and fourth stages Presnya - Lefortovo - Kanatchikovo - at the end of 2015.

Nevertheless, it was decided not to rush and launch the ring when it was fully ready - the project was too complex and large-scale.

In December 2015, trains on the Moscow Ring Road were supposed to depart in test mode, but as of the third quarter of 2015, the work was 70% completed.

It is expected that no earlier than the fall of 2016, full-fledged passenger transportation will be established on the Small Ring.

Moscow Ring Railway and World Cup 2018

Some time ago, information was announced that the Moscow Ring Road would be reconstructed for the 2018 FIFA World Cup. But now, according to those in charge, traffic along it will be launched in the fall of 2016.

Fares on the Moscow Ring Railway and train intervals

The cost of travel on the Small Ring will be the same as on the subway. The same tariffs and passes will apply here, which, you see, is very convenient for passengers.

Light metro trains will run every 6 minutes.
  • The Moscow Ring Railway is called the “road of the future”. Thanks to it, the “deserted” industrial zones of the capital will find a second wind and will be included in a busy transport ring.
  • The Small Ring will connect the gardening estates of Moscow, which is also very convenient for its guests and residents. We are talking about Sparrow Hills, the Mikhailovo and Streshnevo estates, the Botanical Garden, VDNKh, Losiny Ostrov National Park.
  • Trains on the Moscow Ring Railway will be able to accelerate to 120 km/h, so travel is guaranteed. The cabin provides free Wi-Fi, sockets for phones and other gadgets, and a climate control system.
  • The tracks of the Moscow Ring Railway are already called “velvet” - Muscovites will not hear the sound of wheels, and special screens will protect them from excess noise.

Official website of the Moscow Ring Railway

The largest city in Europe, Moscow, is growing and developing year by year. It’s great that in our time we can observe such positive changes as the growth in the number of modern high-quality roads, metro stations and a fundamentally new type of transport that combines the speed and accessibility of the underground with the ability to transfer to buses, trams, and trolleybuses. We are confident that the Small Ring Railway and its trains will quickly gain popularity among residents of the capital, who value time like no one else.

Interactive map of the Moscow Metro.

We promptly update our metro map, add all the Metro and Moscow Central Circle (MCC) stations that are being commissioned, mark those closed for a long period, and also plan to reflect (both on the map and in the calculations) temporary closures of metro sections, which are often carried out along on days off.

How to find the right station on the metro map:

  • on the left is an index of all stations along the lines(optional - lines are highlighted on the diagram)
  • follow the link “all stations” - index of metro stations alphabetically
  • on the right - search form by name(you can enter the name incompletely)

When a station is selected using one of these methods, or directly on the metro map - a dialog appears, marking the location of the station on the metro map and containing:

  • name of station and line to which it belongs (this will help distinguish stations of the same name)
  • link “Details about the station”. By clicking on it, you will find out the operating schedule and interval of the current station, the location of its exits on a large-scale map of Moscow, ground transport routes to other transport hubs of the city, what infrastructure facilities are nearby, and other background information.
  • list of buses, trolleybuses, trams— whose stops are located at the metro exits (each number is also a link to a separate page with a map and list of stops)
  • buttons for building a route In the underground - From or Before this station

To calculate metro travel use these buttons, or enter station names in the form fields at the top left of the page (you can enter incomplete names).

Calculation will start automatically, as soon as both stations are clearly selected. If you typed the name manually and did not use auto-completion, use the button next to the form to start the calculation.

Calculation result - optimal route in terms of time and number of transfers. He stands out on the diagram, and on the left side of the page is displayed route plan.

Left button " Option 2" is displayed if an alternative route is found that is equal or slightly inferior to the first one. Sometimes one option will take longer, but it will have fewer transitions. This is convenient for passengers with heavy luggage.

If there is a direct bus or trolleybus route between selected stations, we will offer it after the route plan.

Start over button will clear the selection and route plan. In order to save link to calculate between two current stations, copy it from the address bar (or add the page to your “Favorites”) of your browser before clicking this button.

Please note that the time required to descend to the platform/exit to the surface, as well as waiting for the train, is not taken into account. Therefore, to the calculated value add 10-15 minutes so as not to disrupt your plans.

Train station icons our metro map is also interactive - they not only indicate the relative positions of metro and railway stations, but also provide the opportunity to quickly find out the train schedule for each station or platform, as well as view interactive diagrams of suburban traffic.

Airport icons mark the transfer points for Aeroexpress trains and ground transport heading to the capital's airports.